Project Details
This project is the construction of a one million square-foot data center project.
Baer Manufacturing Provided:
- Temp service conex’s
- Temp skids
- Temp light fixtures
- Temp lighting cordsets
- Temp power spider boxes
- Temp power PDU’s
- Temp power lift charging stations
- Duct bank
- Stub up racks
- Overhead conduit racks-feeder/branch
- In wall rough in
- Light fixtures
- Equipment stands
- Medium voltage switching skids
- Electric room skids
- Temporary start up/commissioning UPS skids
- Trapeze hangers
- Cable tray