La Crosse, WI

Project Details
This project is a campus renewal project including construction of a new 273, 000 square-foot, 6-story building with a full basement connecting to the existing building.
The new six-floor, 70-bed facility will include:
- A surgical and procedural floor adjacent to and integrated with the current operating rooms, housing pre- and post-surgery recovery rooms
- Endoscopy suites
- Cardiac catheterization labs and Interventional Radiology
- Medical-Surgical units
- Flexible ICU and Progressive Care Unit
- New Family Birth Center
- Shell Space for future growth
Baer Manufacturing Provided:
- Underground – Complete prefab of Main Electrical room
- Underground – Emergency generator duct bank
- Underground – Branch stub up rack
- Underground – Prefab fire pump room
- Overhead – Branch conduit racks
- Overhead – Used Bendworks for Main Electrical room feeders
- In-floor-iron sleeves