Pictured this week we have overhead conduit runs for the Mayo Hospital Expansion project in La Crosse, WI. The color coding makes for easy identification of the different systems being installed within the building. Baer Manufacturing custom built the adjustable carts that the racks are set on. And as you can see, we’ve really been able to load them up!
Project: Mayo Hospital Expansion
Project Manager: Gary Stommel
Project GF: Jared Kinneberg
ACP: Jeremiah Johnson
VDC: Kevin Henschel
Baer Foreman: John Swartz